Engineering inspections
Arrange an inspection around a specific building question.
Start with the brief
Tell us what needs to be examined, which drawings or earlier reports apply, and when the inspection is needed. Access, the visible construction stage and the intended use of the findings determine the inspection scope.
Agree the deliverables
The agreed output may be site observations, a written inspection report or nominated construction-stage advice. Any required measurements, records or follow-up visits should be included in the proposal.
Know the limits
An engineering visit is limited to its agreed scope and accessible conditions. It is not an unlimited guarantee of a building or a substitute for every statutory inspection.
Scope, fees and timing
Confirm the property location, relevant documents, access requirements and decision deadline. Scope, fees, availability and the intended use of the advice are agreed before work begins.
What have you noticed?
Tell us the suburb, the concern and the decision you need to make. The appropriate scope and reporting can then be discussed.